Reekie Experience
82 27/11/2002 DRILL OUT AND FIT INSERTS TO FIAT CAB LOCATION MOUNTS. NOMINAL THREAD SIZE IS M24 FINE
78 26/11/2002 ULSTEIN GEARBOX BORING – ISLE OF MULL
73 22/11/2002 LINE BORING A HIGH SPEED STRIP FEED PRESS MAIN BEARING HOUSING
75 22/11/2002 1000 CONE UPPER FRAME WITH NEW RING INSERT
71 21/11/2002 HIRE OF MILLING EQUIPMENT MH32 ON RAB
68 20/11/2002 1000 CONE UPPER FRAME WITH NEW RING INSERT
67 19/11/2002 CUT 18″NB PIPE,WELD PREP
54 08/11/2002 MILL TWO POCKETS IN BORE
56 08/11/2002 MACHINE 2-OFF LARGE FLANGES
57 08/11/2002 BORE PIVOT BLOCK
59 08/11/2002 PACKAGING AND TRANSPORTATION TO ABERDEEN
59 08/11/2002 TARGET BLOCK TYPE “B” FOR WINDLASSES
59 08/11/2002 TARGET BLOCK TYPE “A” FOR WINDLASSES
51 07/11/2002 1000 CONE UPPER FRAME DOWEL REPAIR ONLY
47 04/11/2002 ATTEMPERATOR SPRAY NOZZLES
44 31/10/2002 MOBILSATION OF 0NE OPERATOR TO FLARE ONE 14″ CUNI 90°
45 31/10/2002 MOBILSATION AND HIRE OF ONE MAN FOR 4″ & 6″ FLARE ON BRENT CHARLIE
40 28/10/2002 HIRE OF T115 AND TOOLING
41 28/10/2002 STIRRUP CAP (Mk 3)
41 28/10/2002 HTS STIRRUP PAD
41 28/10/2002 MS STIRRUP
34 25/10/2002 ATTEMPERATOR SPRAY NOZZLES
35 25/10/2002 MACHINE THE 135mm WIDE BEARING STRIP OF A SOAKING DRUM 10′ FT DIAMETER
36 25/10/2002 MV LOCH LINNE LINE BORING FWD RAMP
36 25/10/2002 PHOS BRONZE PLUG
38 25/10/2002 STIRRUP CAP (Mk 3)
38 25/10/2002 HTS STIRRUP PAD
38 25/10/2002 MS STIRRUP
30 23/10/2002 COUPLING BOLT HOLE REAMING
28 22/10/2002 PROFILE SPACERS – 130MM OD X 100MM ID X 5MM THK