In-Situ Machining Test Rig for Fast Rig Wingsail
Client
Smart Green Shipping
Location
Hunterston Quay, West Coast of Scotland
Scope
In-situ machining and on-site machining of wind turbine foundation studs to enable wingsail test rig installation
The Challenge
Smart Green Shipping approached us to support the delivery of their first FastRig wingsail, a key milestone in advancing low-carbon shipping technology. To reduce both project cost and programme duration, the client made the strategic decision to reuse a redundant onshore wind turbine foundation at Hunterston Quay as the base for a wingsail test rig.
The wind turbine base comprised steel-reinforced concrete with a large number of cast-in threaded studs. While structurally sound, the studs had suffered significant corrosion and mechanical damage during the turbine’s decommissioning. For the test rig to be securely installed, the studs needed to be:
Machined to a uniform height
Re-machined on the outer diameter
Stripped of the existing damaged thread
Re-threaded to a new M39 thread, maintaining 120 mm of usable thread length
Compounding the challenge, the site was remote and fully exposed, with:
No fixed electrical power
No crane or lifting support
Limited access
Harsh coastal environmental conditions
Our Solution
Leveraging our extensive experience in on-site machining and in-situ machining, we developed a bespoke solution tailored specifically for the constraints of the site.
Our engineering team designed a modular machining system that could be securely mounted directly onto the existing foundation. The system allowed a custom-machining plate to be installed, enabling the machine to slide across the plate and machine six studs at a time. This approach significantly reduced setup time and improved productivity.
Key elements of the solution included:
In-situ machining of all studs without removal or heavy lifting
Equipment capable of operating from a 110V generator, eliminating the need for site power
A low-lift, low-handling methodology to maximise safety
Flexible fixing methods, using:
Adjacent serviceable studs where available
Rawl bolts installed directly into the concrete base by our engineers where required
This innovative setup ensured accurate, repeatable machining across all studs while maintaining tight tolerances in challenging offshore-style conditions.
The Result
Despite the exposed location and logistical limitations, the project was:
Completed on time
Delivered within budget
Executed safely and efficiently in a live coastal environment
The successful completion of the in-situ machining works enabled Smart Green Shipping to install their test rig, complete validation testing, and progress their FastRig wingsail to market.
Value Delivered
Extended the life of existing infrastructure through precision on-site machining
Eliminated the need for stud removal or foundation replacement
Reduced project cost and schedule risk
Enabled rapid testing and deployment of innovative clean-shipping technology
Technical Expertise You Can Rely On
This project demonstrates our ability to deliver complex in-situ machining solutions in demanding environments. From bespoke tooling design to precision thread reinstatement, our team brings deep technical knowledge, adaptability, and proven field experience to every project.
To see the success of this project in action, please follow the link below.